Use Case: Implementation of the plant control system for DT power plants with a total capacity of 1950 MW

Project overview

Greiner implemented the electrical infrastructure for three power plants in Egypt, each with a capacity of 650 MW (a total of 1950 MW). For these important power plants, Greiner took over the production, supply and installation of 150 fields of Motor Control Centers (MCC) based on the GENIMOD® product series to ensure reliable and efficient control of the electrical systems.

Challenge

The three power plants in Egypt are part of important energy supply facilities and therefore require a particularly robust and reliable electrical infrastructure. The high temperatures, dusty environmental conditions and the need for continuous maintenance also place the highest demands on the maintainability and reliability of the system.

Project Highlights

  • Supra-regionally important supply location: 3 power plants of 650 MW each
  • Number of installed Motor Control Centers: 150 MCCs enable precise control of the complex systems
  • Special requirements of the high-performance power plant environment: reliability and ease of maintenance for the highest possible operational availability
  • Seamless handover: The power plant operator was optimally guided by our team in the operation of the newly installed plants